1 106 rs 7385 3 14 replaces 11 13 re roofing 4 2 the following equipment may be useful for this phase of the evaluation.
Re roofing checklist.
This is only a general list and is not intended to address all possible conditions.
Roof decks with less than 7 16in.
Pipe jacks and all roof penetrations 11.
Either embed the starter strip in roofing cement or use self adhered starter strips.
Photograph the starter strip installation.
Either embed the starter strip in roofing cement or use self adhered starter strips.
In this guide we will go through some of the most common forms used by roofing businesses roof inspection report roofing estimate form pre construction checklist roof contract form and job completion and roofing certification form.
1 7 2 asphalt shingles 3 9 must be high wind rated and be installed with.
Fortified home high ind re roofing checklist 1 7 asphalt shingles 1 7 1 starter strips adhered at the eave and rake.
Paper or evaluation checklist and pencil 3.
Sheathing can be re decked with 7 16in.
Seal exposed nail heads 10.
1 fortified re roofing checklist march 2019 fortified home hurricane fortified roof reference 1.
Hip and ridge attachment and exposure 13.
Minimum roof deck sheathing and 24 in.
1 7 2 asphalt shingles 3 9 must be high wind rated and be installed with six nails.
Gutters and downspouts complete.
This checklist is intended for use to prepare for an inspection.
Inspection checklist residential re roof july 2016 this inspection checklist reflects code requirements of the 2015 international residential code irc.
Bird block flashing at soffit roof intersection seal gaps 14.
Re nail siding at step flashing if needed 8.
Maximum rafter framing required.
Check b vent cap for proper installation 12.